Tel: 031 577 7868 - disc@darulihsan.com               google play icon        twitter web      

Based at the Lethabo Power Station, Free State, Eskom is building a groundbreaking 75MW solar plant worth R1.2 billion, which aims to integrate renewable energy generation into the coal-fired power utility’s fleet.

According to Saudi Arabia’s General Authority for Statistics (GASTAT) the total number of pilgrims that performed Hajj 2026 is 1,707,301, which includes male and female pilgrims across the holy sites.

Monday, 01 June 2026 09:33

KZN: R2 Billion School Funding Secured

This week, the KwaZulu-Natal Provincial Treasury secured R2 billion from the National Treasury, which aims to assist the provincial Department of Education meet its school funding obligations across KZN.

Years after the devastating impacts of the April 2022 floods in Durban, affected families have recently been handed over new homes in the Cornubia area.

This week, one of two off-grid, solar-powered electric vehicle charging stations was launched along the N3; a key connection between Johannesburg and Durban.

Where the peak summer temperatures in Makkah exceed 45°C, Masjid al-Haram maintains a consistent and comfortable 22°C-24°C indoor temperature.

Page 1 of 260

Nisab

05/06/2026 08:00

- Mahr Fathimi: R58 450
- Minimum Mahr: R1 169
- Zakaat Nisab: R23 380
Price/g rate: GoldPriceZ

Contact Us

70 Joyce Road
Durban
Tel: 031 577 786 8
disc@darulihsan.com

Banking Details

Bank: FNB
Acount Name: Darul Ihsan
Branch: 220329 (Tongaat)
Lillah: 62130045398
Zakaat: 62130044910